Design phase:
1. Determine the size and structural form of the shelter to meet specific usage requirements.
2. Consider the ventilation, lighting, insulation and waterproof performance requirements of the shelter.
3. Design the pull-out mechanism, including pull-out rails, pull rods and locking devices, etc., to facilitate the entry and exit of personnel and the transportation of goods.
4. Consider the internal layout of the shelter to meet usage requirements, such as setting up beds, office areas, storage spaces, etc.
Purchase and processing phase:
1. Purchase the required materials and accessories, such as steel plates, aluminum alloys, plastics, etc.
2. Process and manufacture the shelter structure and pull-out mechanism according to the design drawings.
3. Ensure the quality of materials and accessories in accordance with relevant standards and specifications.
Installation phase:
1. Install and debug the shelter according to the design drawings to ensure that the structure is stable, safe and reliable.
2. Install the pull-out mechanism to ensure its normal operation.
3. Carry out grounding protection and electrical safety acceptance in accordance with regulations.
Maintenance and management stage:
1. Regularly check the working status of the shelter and the pull-out mechanism, and repair and maintain them in time.
2. Formulate the use and management regulations of the shelter to ensure safe use.
3. Clean the interior of the shelter in time to keep it clean and hygienic.
In short, the design and construction process of the pull-out shelter involves multiple links, and various factors need to be fully considered to ensure the quality and use effect of the shelter.